Solido Smart STP Under a Vehicle-Rated Slab – Quality Reinstatement on Immaculate Grounds

The owners of a Farm near Ottery St Mary kept immaculate grounds and needed their new STP installed under a vehicle-rated driveway slab – with the reinstatement matching their standard. WCI delivered.

Ottery St Mary, Devon

Summary

  • Steel-reinforced concrete slab over the treatment plant - rated for vehicle traffic
  • Hot tarmac finish rolled to a seamless result on all driveway cuts
  • Annual WCI service contract in place

Overview

The owners of a working farm near Ottery St Mary wanted to upgrade their septic tank to a compliant system. With immaculate grounds and the need for a vehicle-rated installation beneath the driveway, the quality of reinstatement was as important as the engineering.

The Challenge

The new treatment plant needed to sit under the driveway and bear vehicle traffic. Every surface needed to be returned to the standard the owners expected.

The WCI Solution

A Solido Smart STP was installed under a steel-reinforced concrete slab in the driveway, reusing the existing discharge pipework to the watercourse. All turf was stripped and saved, topsoil separated, trenches compacted for long-term settlement prevention, and all tarmac cuts reinstated with hot tarmac and rolled to a seamless finish.

The Outcome

On time, on budget and seamlessly finished. The system is maintained under a WCI annual service contract.

To discuss your installation or groundworks project, contact WCI today.

Talk to our team of experts for assistance on your project

Naomi Taylor
WCI Group Director
01984 623 404
Speak to the experts

Contact one of our specialist across our four divisions

Get in Touch