Newton Brook Caravan and Camping needed a new sewage treatment plant sized for up to 400 people at peak season. WCI Water & Wastewater Engineers specified a certified HiPAF system and managed the full installation.
Summary
- 400 PE maximum - based on 100 pitches at 4 persons, 40m³/day
- BS EN 12566-3:2005 certified plant to EA permit standard 20:30:05
- Rainwater harvesting conversion of existing on-site tank also completed
Project in numbers
400 PE
Based on 100 pitches at 4 persons, 40m³/day
BS EN 12566-3:2005
Certified plant
Overview
Newton Brook Caravan and Camping needed a new sewage treatment plant sized for its full seasonal population. WCI Water & Wastewater Engineers specified a certified system sized to British Water Flows and Loads guidelines and managed the full installation.
The Challenge
The system needed to treat to the EA permit criteria at peak seasonal load for 100 pitches, with discharge directly to the adjacent watercourse.
The WCI Solution
A WPL HiPAF plant was installed in the lower field, sized to 40m³/day and certified to BS EN 12566-3:2005. The existing on-site tank was converted to a rainwater harvesting system.
The Outcome
The park has a modern certified sewage treatment system serving its full seasonal capacity.