Your old septic tank will be emptied and decommissioned. Where it is close to the installation position of the new system, it will typically be infilled with compressible material and the area levelled. If the new system must be installed in exactly the same location, the old tank will be excavated and disposed of responsibly.
Your old septic tank will be emptied and decommissioned. Where it is close to the installation position of the new system, it will typically be infilled with compressible material and the area levelled. If the new system must be installed in exactly the same location, the old tank will be excavated and disposed of responsibly.