fbpx

Langdons Business Park

The site had very little space available and a system was required that could be installed under a concreted yard capable of withstanding heavy vehicle loads. Given very limited space, vehicle loadings and minimal noise requirements, WCI selected a 70pe WPL HiPAF Midi package sewage treatment plant capable of treating up to 210,000 litres of sewage a day. The system was complemented with a separate final effluent pumping station equipped with a duty/standby duplex pumping station.

The new sewage treatment plant was sited and installed as per the manufacturer’s instructions, surrounded in concrete and backfilled with soil. The air blower kiosk was discreetly positioned next to the garden fence and then the whole system was commissioned by a WCI British Water accredited and GRAF trained service engineer.

Having completed the installation, the team got to work restoring the grounds. The garden was returfed, the fence erected and the patio and the decking reinstated. The owners were left with a fully compliant and eco-efficient treatment plant which brought about a reduction of 1.01kg of Total Phosphorous (TP) per year.

<\\/svg>\\n\\t\\t\\t\\tFacebook<\\/span><\\/a>\",\"twitter\":\"\\n\\t\\t\\t\\t<\\/svg>\\n\\t\\t\\t\\tTwitter<\\/span><\\/a>\",\"pinterest\":\"\\n\\t\\t\\t\\t<\\/svg>\\n\\t\\t\\t\\tPinterest<\\/span><\\/a>\",\"whatsapp\":\"\\n\\t\\t\\t\\t<\\/svg>\\n\\t\\t\\t\\tWhatsApp<\\/span><\\/a>\",\"linkedin\":\"\\n\\t\\t\\t\\t<\\/path><\\/svg>\\n\\t\\t\\t\\tLinkedIn<\\/span><\\/a>\",\"email\":\"\\n\\t\\t\\t\\t<\\/path><\\/svg>\\n\\t\\t\\t\\tEmail<\\/span><\\/a>\"}'; /* ]]> */