Hendre Bach

The solution was to install a small pumping station underground in close proximity to the garage and a pumped rising main running the short distance from the station to the septic tank. The electricity supply for the pump and high level alarm was drawn from a connection in the garage. Small projects demand simple, cost-effective solutions!

The new sewage treatment plant was sited and installed as per the manufacturer’s instructions, surrounded in concrete and backfilled with soil. The air blower kiosk was discreetly positioned next to the garden fence and then the whole system was commissioned by a WCI British Water accredited and GRAF trained service engineer.

Having completed the installation, the team got to work restoring the grounds. The garden was returfed, the fence erected and the patio and the decking reinstated. The owners were left with a fully compliant and eco-efficient treatment plant which brought about a reduction of 1.01kg of Total Phosphorous (TP) per year.

<\\/svg>\\n\\t\\t\\t\\tFacebook<\\/span><\\/a>\",\"twitter\":\"\\n\\t\\t\\t\\t<\\/svg>\\n\\t\\t\\t\\tTwitter<\\/span><\\/a>\",\"pinterest\":\"\\n\\t\\t\\t\\t<\\/svg>\\n\\t\\t\\t\\tPinterest<\\/span><\\/a>\",\"whatsapp\":\"\\n\\t\\t\\t\\t<\\/svg>\\n\\t\\t\\t\\tWhatsApp<\\/span><\\/a>\",\"linkedin\":\"\\n\\t\\t\\t\\t<\\/path><\\/svg>\\n\\t\\t\\t\\tLinkedIn<\\/span><\\/a>\",\"email\":\"\\n\\t\\t\\t\\t<\\/path><\\/svg>\\n\\t\\t\\t\\tEmail<\\/span><\\/a>\"}'; /* ]]> */