Garage conversion requires pump

Hendre Bach is a three-bedroom house in Somerset with a separate converted garage. In order to add shower facilities to the adjacent garage building, the installation and supply of a foul water pumping station was required to lift the sewage and waste water from the facilities in the converted garage to the existing septic tank on the property.

The solution was to install a small pumping station underground in close proximity to the garage and a pumped rising main running the short distance from the station to the septic tank. The electricity supply for the pump and high level alarm was drawn from a connection in the garage.

Specification

270 litre Xylem Micro 6 Automatic Lifting Station.

50mm MDPE discharge pipe line.

Electrical supply and installation of armoured electric cable.

Electrical connection and commissioning by Part-P certified electrician with an Electrical completion certificate issued on completion of works.

If you have any questions about the information presented in this case study, or you would like to talk to us about your off mains drainage options, please contact WCI on 01984 623404 or via the contact form below.

Contact Us

Please complete the form and a member of the team will be in touch shortly

If you have any questions or just need some clarification on the regulations and how they apply to your property, please call us on 01984 623404